Learner Reviews & Feedback for Construction Scheduling by Columbia University

4.8
stars
2,078 ratings

About the Course

This course focuses on learning how to develop and manage a schedule. The first module provides an overview of the Construction Scheduling course. The second module introduces bar or Gantt charts and how they are used as scheduling tools. During the third module, learners will create activity precedence diagrams, also referred to as activity on node diagrams, which graphically represent the construction activities in a project and their relationships. The fourth module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram. Forward and backward pass calculations are covered in the fifth module, and during the sixth module, Professor Odeh discusses the importance of critical paths, including what it is and why it is important. By the end of this course, you will be able to: -Discover key project scheduling techniques and procedures -Learn how to develop and manage a schedule, and understand scheduling tools such as bar charts, activity on arrow, and activity on nodes -Explore the multiple relationships that connect all the construction activities in our project from start to finish -Learn about creating a network diagram, defining the importance of the critical path in a project network, and defining project activities float -Understand the fundamentals of bar charts, precedence diagrams, activity on arrow, Program -Evaluation and Review Technique (PERT), range estimating, linear project operations, and the line of balance (LOB)...

Top reviews

FL

Dec 26, 2016

The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.

TG

Apr 10, 2022

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

Filter by:

1 - 25 of 391 Reviews for Construction Scheduling

By George V

•

Sep 10, 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

By Leigh F

•

May 14, 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

By Geder M

•

Sep 27, 2019

This course is dedicated to anyone in the construction management industry and/or the willingness to learn about construction management. I will highly recommend this course!

By Vahid T

•

Dec 24, 2019

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

By Vladimir V C

•

Nov 21, 2018

It is incredible that for a paid course, the slides are not downloadable

By Felix L

•

Dec 27, 2016

The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.

By Tsegaye G

•

Apr 11, 2022

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

By Daniel E S

•

Oct 10, 2019

I thought that the course was a bit too simplistic. I would have liked more detailed examples and assignments. Also, it would have been nice to have most of the later slides to print out or copy. Some of the diagrams were a bit tedious to draw.

By JB K

•

Jun 22, 2019

Week 4 there were some obvious miscues. The quiz had two questions related to the 7th calculation for the Line of Balance. However, Mr. Odeh went from the 6th equation to the 8th, skipping the 7th entirely. I had to dig in the forums for the equation, in order to complete the weeks project and the quiz.

By Elizabeth J

•

Apr 19, 2019

I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.

By Jude B

•

Jul 31, 2017

Top of the line course. There's one really boring guy though. Not going to single him out, but it definitely isn't Ibrahim Odeh. One recommendation would be to include the lecture slides for download as down under the Construction Project Management specialization subject.

By Oleh O

•

Apr 28, 2019

Hello! Very interesting course.

Because of practically absence of hands-off materials learning will take a little more time. It will be nice if add practical part to topic about apps for scheduling, even it`ll be free app

By Aldo P

•

Apr 30, 2020

this course gave me a lot of tools and concepts to bring into my professional construction experience. Sometimes i've found some questions too generic and their answers, after a depth analysis, were not well-fitted.

By Muhammad J S

•

Dec 27, 2016

I am really fascinated by this course and its a first step towards Project Planning and specially Lean Scheduling Its a brilliant and advance method in Construction field.

By Server B

•

Jun 25, 2018

informative, teaches principles, theory but not arousing interest. There is room to improve.

By robin r

•

Mar 27, 2020

Great course, very instructive.

However the videos showing the BIM are not high resolution enough to see what appeared on the software making it a bit hard to follow. For that part it would be better to try the steps dictated by the teacher on a trial version. The BIM part of this course should be more hands on.

The lean part of this course should be more detailed. I would have like to know more about the way to use lean in a boardroom using post it.

The risk management was very interesting. There should be an emphasis in this certification about the fact that a baseline is uncomplete without a risk analysis because the project will always have some delays. I would have like to more hands on how to do a Monte Carlo risk analysis using a simple tool for example Excel.

Thank you all!

By Faraz A

•

Nov 9, 2019

This is theory based course only which does not allow us to work on the actual software like we did in earlier course. The theory is very good to provide the knowledge but if we do not apply the concepts on the actual software to do the assignments then it is hard to understand the concept.

Hopefully in future students do have the ability to use the actual software to do the assignments.

By Daniel E

•

Feb 6, 2022

the course is very old, the technologies, softwares and examples we are living right know are much different from what is explain on this course.

By Stephen R

•

Mar 31, 2017

Lots of bugs

By M J A

•

Sep 21, 2023

The "Construction Scheduling" course has proven to be exceptionally beneficial in fulfilling my objectives related to construction scheduling. Its comprehensive content, expert instruction, and practical exercises have equipped me with the essential knowledge and skills needed for effective project planning and management in the construction industry. The course has provided valuable insights into critical areas such as project timelines, resource allocation, and risk mitigation. Its hands-on approach and real-world applications have allowed me to immediately apply what I've learned, making it a highly relevant and impactful learning experience. Overall, this course has been instrumental in enhancing my competence and confidence in construction scheduling.

By Carlos P G

•

Apr 23, 2020

I find the course very detail and it gives the learner all the aspects a Construction Scheduler has to know. It will feed you all the in-depth tools you may need in the course of your chosen career. Most noted in the course was about Lean Planning wherein I never knew the difference as I practice my Project management skills that there was the standard industry practice and the Pull planning method which I think are effective and proactive approach in Construction Management.

I would like to thank the professors and lecturers that has guided us thru the course and I highly recommend this course to all would be Construction Scheduler or Project Manager.

By James M

•

Nov 30, 2017

I found this to be a good introduction to scheduling, the methods involved and the base techniques required to get your feet wet. In general due to the large variation in scheduling methods discussed, each learner would be required to step out and explore more on their own for a deeper look in to the processes. Real time scheduling videos were great, i often step in to new programs see all the buttons and feel overwhelmed but after these quick videos and breakdowns we learned the essential thought processes that go into the background design of each scheduling software. I enjoyed the set up, discussions and interactive schedule building.

By Thomas M

•

Jul 7, 2017

This course provided a comprehensive overview of the major determinants of a schedule in the construction sector. It gave a good overview of best-practices when building out a schedule, and stressed the importance of scheduling to the profitability and success of a project. I would have appreciated a more in-depth view of popular construction scheduling software, perhaps by requiring or encouraging their use for projects, but I certainly understand the decision not to do so -- There are other resources out there to help with that. Overall, this course was excellent in its depth and structure!

By Gabriel M

•

Dec 29, 2017

Very informative course which covers the fundamentals of Construction Scheduling. I learned essential scheduler tools such as how to draw an AON diagram, AOA diagram, LoB Diagram that will help me in my future career as Civil Engineer. In addition, it gives an introduction to Microsoft Project and Primavera P6 which are some of the most important software in the market. To wrap it up, I learned a great deal in this course and I recommend it to anyone interested in the Construction sector.

By Nalovsky

•

Mar 20, 2018

Excellent course, I hope to know a course about LEAN CONSTRUCTION in detail, the one that the Arqch in the last videos spoke about, because this is a excelent tool to use in the field with weekly works programs (wagons) % of completion, yu can see weekly even daily the risks and the mitigations actions. I worked in Mexico with this program in BMW plant in San Luis Potosí, and I had a great oportunity to be surrounded by Residets, Superintendets, Scheduling, PM, CM´s with this education.